Drax Power Bioenergy with Carbon Capture and Storage DCO Hearings
Drax Power
The Event
Drax Power Limited proposes to install post-combustion capture technology that would capture carbon dioxide emissions from up to two of the existing biomass units at Drax Power Station. The proposal includes the construction and operation of carbon capture technology and associated equipment, and the integration of the units into the existing Common Services at Drax Power Station. The proposalwas accepted for DCO examination by the UK Planning Inspectorate in January 2023.
Our Role...
Production 78 deliver event management, AV and technical services required to hold a 6 month long series of public hearings by the UK Government's Planning Inspectorate.
This includes use of our touch to talk microphone system, temporary internet, large format projection and digital screens to display plans, venue liaison and planning of all the requirements of this process for our clients.